Description
It’s the boat’s turn to pass by. Just turn the crank to lift the bridge and manually lower the stop barriers. Includes 2 ascending tracks for easy connection to the Railway system.
For 3 years+
It’s the boat’s turn to pass by. Just turn the crank to lift the bridge and manually lower the stop barriers. Includes 2 ascending tracks for easy connection to the Railway system.
For 3 years+